Howell Labs: Home

Howell Laboratories, Inc.

P. O. Box 389, 188 Harrison Rd., Bridgton Maine 04009 USA
(207) 647-3327 (888) 744-8359 FAX (207) 647-8273 contracts@howelllabs.com

- An Employee-Owned Company -
Certified to ISO 9001:2000

Model 7060 MIOX Electrolytic Disinfectant Generators

Footprint and Interface Locations


7060 Mark I

Mounting Footprint:

NOTE
Mounting holes are for 3/4" mounting bolts or studs.

Interfaces:

Description Fitting "A" "B"

1
Ship’s LP air in MIL-F-1183 Union, 1/4” IPS
15-3/4"
23"
2
Water in for brine and mixed oxidant MIL-F-1183 Union, 1/4” IPS
18"
12"
3
Water softener drain MIL-F-1183 Union, 1/2” IPS
15-7/8"
6-1/2"
4
Brine tank drain MIL-F-1183 Union, 1/2” IPS
19-1/4"
2-7/8"
5
Mixed oxidant tank drain Titanium flange, 1/2” IPS
23-1/2"
3-1/8"
6
Treated water out Titanium flange, 1/2” IPS
27-7/8"
5"
7
Water in for treatment MIL-F-20042 flange, 1” IPS
23-1/2"
11-1/2"
8
Oxidant sample port n/a
n/a
n/a
9
Electrical power in MS3102A-28-03P receptacle
Receptacle on bottom of control panel
10
Remote alarm connection “dry” contacts MS3012A-20-04P receptacle
Receptacle on right side of control panel

7060 Mark II

Mounting Footprint:

NOTE
Mounting holes are for 3/4" mounting bolts or studs.

Interfaces

Description Fitting "A" "B"


1
Drip pan drain MIL-F-1183 Union, 1/4” IPS
see below
2
Ship’s LP air in MIL-F-1183 Union, 1/4” IPS
15-3/4"
23"
3
Water in for brine and mixed oxidant MIL-F-1183 Union, 1/4” IPS
18"
12"
4
Water softener drain MIL-F-1183 Union, 1/2” IPS
15-7/8"
6-1/2"
5
Brine tank drain MIL-F-1183 Union, 1/2” IPS
19-1/4"
2-7/8"
6
Mixed oxidant tank drain Titanium flange, 1/2” IPS
23-1/2"
3"
7
Treated water out Titanium flange, 1/2” IPS
28"
5"
8
Water in for treatment MIL-F-20042 flange, 1” IPS
23-1/2"
11-1/2"
9
Oxidant sample port n/a
n/a
n/a
10
Electrical power in MS3102A-28-03P receptacle
Receptacle on bottom of control panel
11
Remote alarm connection “dry” contacts MS3012A-20-04P receptacle
Receptacle on right side of control panel

Sump and drain locations:

Drip pan drain
MIL-F-1183 Union,
1/4” IPS


7060 Mk III

Mounting Footprint:

NOTE
Mounting holes are for 3/4" mounting bolts or studs.

Interfaces:

Description Fitting "A" "B" "C"

1
Ship’s LP air in MIL-F-1183 Union, 1/4” IPS
15-3/4"
23"
1"
2
Water in for brine and mixed oxidant MIL-F-20042 Flange, 1/4” IPS
18"
12"
1-1/8"
3
Water softener drain MIL-F-20042 Flange, 1/2” IPS
15-7/8"
6-1/2"
1-1/2"
4
Brine tank drain MIL-F-20042 Flange, 1/2” IPS
19-1/4"
2-7/8"
1/2"
5
Mixed oxidant tank drain ANSI B16.5 Titanium Flange, 1/2” IPS
23-1/2"
3-1/8"
1/2"
6
Oxidant sample port Open fitting, not intended for attachment to ship’s piping.
7
Electrical power in MS3102A-28-03P receptacle
Receptacle on bottom of control panel
8
Remote alarm connection “dry” contacts MS3012A-20-04P receptacle
Receptacle on right side of control panel
9
Inline water in for treatment MIL-F-20042 flange, 2” IPS
Flange surface 4-1/2"
C/L 20"
C/L 2-1/2"
10
Inline treated water out ANSI B16.5 Titanium Flange, 2” IPS
Flange surface 27-1/2"
C/L 20"
C/L 2-1/2"
11
Recirc water in for treatment MIL-F-20042 flange, 1” IPS
Flange surface 7-1/4"
C/L 9"
C/L 3-1/2"
12
Recirc treated water out ANSI B16.5 Titanium Flange, 1” IPS
Flange surface 24-25/32"
C/L 9"
C/L 3-1/2"

Sump and drain locations

Drip pan drain
MIL-F-1183 Union,
1/4” IPS


Last updated: 03/18/2008
Webmaster: Al Friend
© 2006-2008 Howell Laboratories, Inc. All rights reserved.
Printable Adobe Acrobat version

Get Acrobat Reader (free download)